Alanya Construction Lawyer

Anasayfa / Makalelerimiz / Alanya Construction Lawyer

Alanya Construction Lawyer

Alanya Construction Lawyer: Construction Contracts, Delays, Defects and Property Disputes

Construction and property development projects in Alanya can involve several different parties and legal relationships at the same time. A single project may include a landowner, developer, contractor, subcontractors, architects, engineers, estate agents and individual property buyers.

When something goes wrong, the legal dispute may therefore involve much more than a simple disagreement about construction.

Common problems include:

  • Delayed construction

  • Failure to complete a project

  • Failure to deliver an apartment or villa

  • Defective construction

  • Missing or lower-quality materials

  • Differences from the approved project

  • Failure to obtain required permits

  • Building-use permit issues

  • Title deed transfer problems

  • Mortgages and attachments

  • Additional payment demands

  • Disputes between the developer and landowner

  • Cancellation of construction or property contracts

  • Recovery of purchase payments

  • Contractor payment disputes

An Alanya construction lawyer can examine the contractual structure, title deed records, payment history, technical documentation and current status of the project before determining the appropriate legal strategy.

Attorney Enes Nergiz is registered with the Antalya Bar Association under registration number 6281. Legal assistance is available in English, Turkish and Russian.

For a general overview of legal services for foreign and local clients, visit our Alanya Lawyer page.


What Does Construction Law Cover in Turkey?

There is no single law governing every construction dispute in Turkey.

The applicable legal framework depends on:

  • Identity of the parties

  • Type of agreement

  • Purpose of the property

  • Whether one party is a consumer

  • Whether the dispute concerns ownership

  • Whether the construction is complete

  • Nature of the alleged breach

  • Relief requested

Construction matters can potentially involve legislation concerning:

  • Contracts

  • Works agreements

  • Consumer transactions

  • Real estate

  • Land registration

  • Zoning and construction

  • Condominium ownership

  • Enforcement

  • Commercial relationships

The Turkish Code of Obligations is particularly important for many contractor and construction relationships.

Where an individual acquires residential property from a professional developer for non-commercial purposes, consumer legislation may also become relevant.

This distinction can affect the competent court, legal remedies and pre-litigation procedure.


Construction Contracts Are Not All the Same

The expression construction contract can describe several legally different arrangements.

Examples include:

  • General construction agreement

  • Turnkey construction contract

  • Renovation agreement

  • Fit-out agreement

  • Construction agreement between landowner and contractor

  • Land-share-for-construction agreement

  • Subcontractor agreement

  • Architectural services agreement

  • Engineering agreement

  • Project-management agreement

  • Developer agreement

  • Off-plan property agreement

  • Prepaid residential property sale

  • Preliminary property agreement

The title written at the top of the document does not by itself determine its legal character.

The actual obligations created by the agreement should be examined.


Construction Contracts Under the Turkish Code of Obligations

Many traditional construction relationships are legally treated as works contracts.

In general terms, the contractor undertakes to create or complete a work and the client undertakes to pay the agreed price.

This legal relationship can create obligations concerning:

  • Performance

  • Quality

  • Delivery

  • Defects

  • Inspection

  • Payment

  • Changes to the work

  • Delay

  • Liability

The contract should therefore identify precisely what must be constructed and under what conditions.


Construction Contracts We Review

Construction-related legal assistance may include review of:

  • Off-plan property agreements

  • Pre-construction agreements

  • Landowner-contractor agreements

  • Land-share construction agreements

  • Turnkey construction contracts

  • Villa construction contracts

  • Renovation contracts

  • Hotel and commercial fit-out contracts

  • Subcontractor agreements

  • Material supply agreements

  • Architectural agreements

  • Engineering agreements

  • Project-management agreements

  • Reservation agreements

  • Payment schedules

  • Delivery protocols

  • Settlement agreements

  • Termination agreements

Related contractual matters are explained in our Alanya Contract Lawyer guide.


What Should a Construction Contract Contain?

A construction contract should describe the commercial agreement in sufficient detail to reduce later uncertainty.

Depending on the project, important provisions may include:

Parties

The agreement should correctly identify:

  • Employer

  • Contractor

  • Developer

  • Landowner

  • Other responsible parties

If a company signs the agreement, the authority of the person signing should be checked.

Scope of Work

The contract should specify what the contractor must actually construct or complete.

Generic descriptions such as “complete renovation” may create disputes unless the scope is clarified.

Technical Specifications

Relevant specifications may include:

  • Materials

  • Brands

  • Dimensions

  • Mechanical systems

  • Electrical systems

  • Insulation

  • Windows

  • Flooring

  • Fixtures

  • Landscaping

  • Common areas

Contract Price

The contract should explain:

  • Total price

  • Currency

  • Taxes where relevant

  • Payment stages

  • Advance payments

  • Retention

  • Additional work

Completion Date

The completion date should be clearly identifiable.

Delivery and Acceptance

The agreement should explain how completion and delivery will be documented.

Variations

Changes during construction should normally be recorded in writing.

Delay

The contract may contain provisions concerning:

  • Additional time

  • Force majeure

  • Delay damages

  • Penalties

  • Notice

Defects

The agreement should address inspection, notification and correction of defective work.


Payment Schedules and Construction Progress

Construction contracts frequently use staged payments.

For example, payments may be connected with:

  • Signing

  • Foundation completion

  • Structural completion

  • Mechanical installation

  • Interior work

  • Final delivery

The payment structure should correspond with the actual commercial risk.

A buyer or employer should understand whether the next instalment becomes due because:

  • A particular construction milestone has genuinely been completed, or

  • Merely because a calendar date has arrived.

This distinction can become important when construction falls behind schedule.


Should You Stop Paying if Construction Is Delayed?

Not automatically.

Stopping payments without reviewing the contract can create additional risk.

The developer or contractor may later argue that the buyer or employer also breached the agreement.

Before suspending payment, it may be necessary to examine:

  • Payment provisions

  • Construction milestones

  • Current completion level

  • Developer obligations

  • Default provisions

  • Notice requirements

  • Right to withhold performance

  • Any security available to the buyer

The correct strategy depends on the agreement and facts.


Off-Plan Property Projects in Alanya

Foreign buyers frequently purchase apartments or villas before construction has been completed.

These transactions can involve greater legal risk because the buyer may transfer substantial money before receiving:

  • Completed property

  • Physical possession

  • Title deed

  • Building-use permit

Before entering an off-plan transaction, it is advisable to examine:

  • Current landowner

  • Developer's legal position

  • Title deed records

  • Mortgages

  • Attachments

  • Construction licence

  • Approved project

  • Contract

  • Payment plan

  • Delivery obligations

  • Title deed transfer provisions

For more information about purchasing property, see our guide to Property Purchase in Alanya with Legal Assistance.


Prepaid Residential Property Sales

Some off-plan transactions involving an individual consumer purchasing residential property from a professional seller may fall within the special rules governing prepaid residential property sales.

The legal consequences can differ substantially from an ordinary construction agreement between two businesses or a private construction contract.

Under the current regulation, qualifying prepaid residential property must be delivered within the contractual period and in any event within a maximum of 48 months from the contract date. For projects of 30 or more residential units, the regulation also provides specific security mechanisms such as building completion insurance, a bank guarantee, a progress-payment system or qualifying linked credit.

Whether these rules apply to a particular buyer should be determined from:

  • Identity of the seller

  • Identity and purpose of the buyer

  • Nature of the property

  • Contract

  • Structure of the transaction

A commercial investor and a consumer may not necessarily have identical legal protections.


Project Changes in Off-Plan Developments

A developer may wish to change a project after contracts have been signed.

Potential changes can concern:

  • Apartment layout

  • Building design

  • Common areas

  • Swimming pool

  • Parking

  • Landscaping

  • Materials

  • Technical specifications

For qualifying prepaid consumer housing transactions, current regulations impose notification requirements for project changes and can provide the consumer with specific rights depending on the circumstances.

For other construction relationships, the contract and general legal rules should be examined.


Landowner and Contractor Disputes

Many Turkish development projects are constructed on land belonging to a person or entity different from the developer.

The project may be based on a land-share-for-construction arrangement.

The landowner may agree to give specified independent sections or land shares to the contractor in return for construction.

This structure can create serious consequences for property buyers if the relationship between the landowner and contractor later breaks down.

Questions may include:

  • Who owns the land?

  • Which units belong to the contractor?

  • Has ownership already been transferred?

  • Is the contractor authorised to sell the particular unit?

  • Has the contractor performed its obligations to the landowner?

  • Is the landowner attempting to terminate the underlying agreement?

Foreign buyers purchasing from a developer should therefore not automatically assume that the developer owns every apartment it markets.


Dispute Between the Developer and Landowner

A dispute between these parties may affect buyers who were not directly involved in the original construction agreement.

Potential consequences can include:

  • Title deed transfer delays

  • Cancellation claims

  • Disputes concerning independent sections

  • Restrictions on the property

  • Multiple competing claims

Where such a dispute exists, both the buyer's agreement and the underlying landowner-contractor relationship may require examination.


Delayed Construction

Late delivery is one of the most common construction complaints.

However, not every delay produces the same legal remedy.

The assessment may consider:

  • Contractual delivery date

  • Construction schedule

  • Duration of delay

  • Reason for delay

  • Force majeure provisions

  • Extensions granted

  • Buyer's payment performance

  • Developer communications

  • Current construction level

Possible responses may include:

  • Formal notice

  • Demand for completion

  • Additional period for performance

  • Negotiation

  • Claim based on delay

  • Contract termination

  • Repayment

  • Litigation

The appropriate remedy depends on the specific legal relationship.


What Counts as Force Majeure?

Developers sometimes explain delays by referring to force majeure.

Whether a particular event legally excuses delay depends on:

  • Nature of the event

  • Contract

  • Causal relationship with the delay

  • Applicable legal principles

A generic contract clause should not automatically be interpreted as giving the developer an unlimited right to postpone delivery.

Likewise, ordinary commercial difficulty should not automatically be treated as force majeure.


Construction Has Stopped Completely

A more serious situation arises where:

  • Workers leave the site

  • Construction remains inactive

  • Developer stops communicating

  • Suppliers are unpaid

  • Attachments appear

  • Company experiences financial difficulties

At this point, simply waiting for another promised completion date may increase risk.

It may be necessary to investigate:

  • Developer company status

  • Title records

  • Current ownership

  • Mortgages

  • Attachments

  • Construction licence

  • Physical completion level

  • Other legal proceedings affecting the project

The appropriate strategy may differ depending on whether the buyer wants:

  • Completion

  • Another property

  • Title transfer

  • Refund

  • Compensation


Developer Insolvency, Concordat or Bankruptcy

Construction disputes become significantly more complicated where the developer enters financial distress.

Issues may include:

  • Concordat

  • Bankruptcy

  • Enforcement proceedings

  • Attachments

  • Multiple creditors

  • Uncompleted projects

A buyer may have contractual rights but still face practical recovery risks if the developer lacks sufficient assets.

In such situations, timing and the legal nature of the buyer's claim can become particularly important.


Defective Construction

Construction defects may be:

  • Visible at delivery

  • Hidden and discovered later

Examples include:

  • Water leakage

  • Roof defects

  • Poor waterproofing

  • Insulation deficiencies

  • Cracking

  • Electrical defects

  • Plumbing defects

  • Drainage problems

  • Faulty windows

  • Structural concerns

  • Defective flooring

  • Incomplete installations

  • Poor workmanship

The existence of a defect does not automatically determine which legal remedy applies.

The nature, seriousness, repairability and timing of the defect should be assessed.


Inspection and Notice of Defects

Under the works-contract provisions of the Turkish Code of Obligations, the client has obligations concerning inspection after delivery and notification of defects within an appropriate period.

The law also permits either party, at its own expense, to request expert inspection and documentation of the condition of the work.

This means that waiting for months while repeatedly discussing visible defects informally can create unnecessary legal risk.

Important complaints should be documented properly.


Rights Arising From Defective Work

Where the contractor is legally responsible for defects, Turkish works-contract law can provide different remedies depending on the circumstances.

These may include:

  • Termination where the defect is sufficiently serious

  • Reduction of the contract price

  • Repair at the contractor's expense where appropriate

  • Compensation under applicable conditions

The availability of these remedies depends on the nature of the work and legal relationship.

For example, termination may not be appropriate in every construction case simply because some defects exist.


Hidden Defects

Certain problems may only become apparent after the property has been used.

Examples may include:

  • Waterproofing failure

  • Internal plumbing problems

  • Hidden electrical defects

  • Structural deficiencies

  • Insulation defects

When a previously unknown problem appears, the owner should consider:

  • Documenting it immediately

  • Notifying the relevant party

  • Preserving technical evidence

  • Avoiding unnecessary destruction of evidence

Repairs may be necessary for safety reasons, but where possible the original condition should first be documented.


Determination of Evidence

One of the most useful procedural tools in construction disputes can be determination of evidence (delil tespiti).

This can be particularly important where:

  • Defects need urgent repair

  • Construction will continue and cover existing problems

  • The condition of the property may change

  • Another contractor will take over

  • Technical measurements are necessary

The purpose is to preserve evidence for later legal proceedings.

Depending on the circumstances, a court-appointed expert may inspect the site and prepare technical findings.


Why Expert Evidence Matters

Judges are not expected to personally determine technical questions such as:

  • Whether concrete meets specifications

  • Whether waterproofing is defective

  • Percentage of construction completion

  • Cost of repair

  • Difference between approved project and actual construction

  • Value of incomplete work

Construction litigation therefore frequently requires expert evidence involving appropriate technical disciplines.

A dispute may require experts such as:

  • Civil engineer

  • Architect

  • Mechanical engineer

  • Electrical engineer

  • Real estate valuation expert

depending on the issue.


Do Not Repair Everything Before Documenting the Problem

A property owner may understandably want urgent repairs.

However, if the defective condition disappears before it has been documented, proving the original problem later may become more difficult.

Where reasonably possible, preserve:

  • Photographs

  • Videos

  • Measurements

  • Technical reports

  • Invoices

  • Samples where appropriate

before substantial remedial work.

Health and safety should nevertheless take priority where immediate intervention is required.


Incomplete Construction

Incomplete work differs from defective work.

Examples include:

  • Missing kitchen

  • Missing doors

  • Incomplete pool

  • Unfinished landscaping

  • Missing air-conditioning system

  • Unfinished common areas

  • Incomplete electrical installation

The contractual technical specification is often critical.

A buyer cannot simply rely on what they remember being promised.

Relevant evidence can include:

  • Contract

  • Appendices

  • Brochures

  • Floor plans

  • Advertisements

  • Correspondence

  • Technical specifications


Common-Area Defects

Apartment buyers may experience problems not inside their own unit but in the shared building.

Examples include:

  • Roof

  • Façade

  • Swimming pool

  • Lift

  • Garage

  • Garden

  • Drainage

  • Common electrical systems

  • Fire safety installations

These disputes can involve both construction law and condominium law.

The identity of the party entitled to bring a particular claim should therefore be examined.


Delivery Protocols

Developers often ask buyers to sign a delivery or handover protocol.

The document should be read carefully before signature.

If defects or unfinished work exist, it may be important to record them specifically rather than signing an unconditional statement that:

“The property has been delivered completely and without defects.”

A delivery protocol can later become important evidence.


Title Deed Transfer and Construction Disputes

Construction completion and ownership transfer are separate issues.

A buyer may face a situation where:

  • Property is completed but TAPU is not transferred

  • TAPU is transferred but construction remains incomplete

  • Property is delivered but title contains restrictions

  • Developer promises title after additional payment

The current title deed status should therefore be checked separately.

For detailed information, see our Title Deed Transfer Problems in Alanya guide.


Mortgage and Attachment Problems

A project property may be burdened by:

  • Bank mortgage

  • Enforcement attachment

  • Court restriction

  • Other registered rights

Buyers should not automatically assume that these entries will disappear when construction ends.

Where the seller promises to remove a mortgage before transfer, the payment and discharge process should be structured carefully.


Construction Licence – Yapı Ruhsatı

A construction project should be examined in light of its relevant building permit and approved plans.

Issues may arise where:

  • Construction differs from the permit

  • Additional floors are built

  • Common areas are altered

  • Apartment layout differs

  • Unauthorised additions are made

The legal status of the physical structure should not be assessed solely by looking at the sales brochure.


Building-Use Permit – Iskan

The Yapı Kullanma İzin Belgesi, commonly referred to as Iskan, concerns the use of a completed structure within the applicable building and zoning framework.

A completed-looking apartment does not automatically establish that all administrative building procedures have been completed.

The status of the Iskan can therefore be an important part of due diligence and certain construction disputes.

Official guidance also confirms that the building-use permit is tied to the building-permit and completion framework.


Iskan Is Not the Same as TAPU

This distinction is important.

TAPU relates to registered property ownership.

Iskan concerns the building-use status.

A buyer may therefore have a title deed while separate questions remain concerning the building's administrative or construction status.


Kat İrtifakı and Kat Mülkiyeti

The property may be registered under:

  • Kat irtifakı, or

  • Kat mülkiyeti

These concepts should be reviewed together with:

  • Project completion

  • Iskan

  • Approved plans

  • Actual physical condition

The wording on the title deed alone should not replace a broader investigation.

For a more detailed explanation of title registration, see our Legal Aid for Real Estate Registration in Alanya guide.


Developer Fails to Obtain Iskan

Some buyers discover after delivery that the expected building-use permit has not been obtained.

The legal implications depend on:

  • Contract

  • Reason for the missing permit

  • Construction status

  • Approved project

  • Developer obligations

  • Current administrative position

A buyer should first determine whether the developer expressly or implicitly undertook responsibility for obtaining the required documentation.


Project Does Not Match the Approved Plans

A discrepancy between:

  • Sales contract

  • Approved project

  • Actual construction

can create significant problems.

Examples may include:

  • Different apartment size

  • Closed balconies

  • Additional rooms

  • Altered terraces

  • Changed common areas

  • Different floor layout

Such disputes may have contractual, zoning and condominium-law dimensions.


Additional Work and Change Orders

Construction often changes during the project.

A contractor may claim:

“The owner requested extra work.”

The owner may respond:

“That work was already included in the original price.”

To reduce such disputes, additional work should ideally document:

  • Description

  • Price

  • Effect on completion date

  • Materials

  • Approval

Oral variation instructions can become difficult to prove later.


Fixed Price and Additional Cost Disputes

Turnkey and fixed-price contracts frequently produce disputes when material or labour costs increase.

Whether a contractor can demand additional payment depends on the agreement and applicable law.

A contractor should not automatically assume that increased market costs entitle it to unilaterally rewrite the agreed price.

At the same time, exceptional circumstances and contractual adjustment clauses may require separate legal assessment.


Contractor Abandons the Project

If the contractor leaves the construction unfinished, the employer should avoid immediately hiring somebody else without documenting:

  • Existing completion level

  • Defects

  • Materials on site

  • Work performed

  • Cost required for completion

A technical determination can later be important for calculating claims between the parties.


Employer Terminates the Contractor

Termination of a construction contract requires careful planning.

Before termination, consider:

  • Grounds for termination

  • Required notice

  • Opportunity to remedy breach

  • Current progress

  • Payments made

  • Materials

  • Site possession

  • Guarantees

  • Security instruments

A poorly planned termination can lead both parties to accuse the other of wrongful termination.


Contract Termination and Refund

Property buyers may also seek to terminate a developer agreement.

Potential grounds can include:

  • Serious delay

  • Failure to deliver

  • Failure to transfer title

  • Material project changes

  • Serious defects

  • Other fundamental breach

The correct remedy depends on the contract and legal regime.

For further information, see our guide to Real Estate Contract Cancellation in Alanya.


Recovery of Payments From a Developer

Where termination is legally available, the buyer may seek return of money already paid.

Relevant evidence includes:

  • Contract

  • Payment schedule

  • Bank transfers

  • SWIFT documents

  • Receipts

  • Invoices

  • Correspondence

Where payments were made to several companies or individuals, the relationship between the recipients must also be investigated.


Developer, Landowner and Estate Agent May Be Different Parties

A project transaction can involve:

  • Landowner A

  • Developer B

  • Marketing company C

  • Estate agent D

while the buyer transfers money to yet another company.

This structure can complicate litigation.

The legal analysis should identify:

  • Who promised the property

  • Who owns it

  • Who signed the contract

  • Who received the money

  • Who controlled the project

  • Which parties may bear legal responsibility


Interim Injunctions in Construction and Property Disputes

A buyer may be concerned that the disputed apartment will be transferred to another person while proceedings continue.

In an appropriate case, interim judicial protection, including an interim injunction, may be considered where its statutory conditions are satisfied.

Such measures are not automatically granted.

The court evaluates the claim, evidence and urgency.

The purpose is generally to preserve the effectiveness of the litigation until a final decision can be made.


Interim Attachment for Monetary Claims

Where the principal claim is repayment of money rather than transfer of a particular property, an interim attachment may potentially be relevant if the legal conditions are satisfied.

This can become important where there is a genuine risk concerning recovery from the debtor's assets.

An interim attachment and an interim injunction are legally different measures and should not be used interchangeably.


Mediation in Construction Disputes

Whether mediation is mandatory depends on the legal nature of the dispute.

Construction matters may potentially be:

  • Consumer disputes

  • Commercial disputes

  • Ordinary civil disputes

  • Condominium disputes

  • Property-right disputes

Current Turkish law provides mandatory mediation for various categories of disputes, but the precise scope differs. Consumer disputes involving rights in rem over real estate are specifically treated differently from ordinary consumer monetary disputes, and condominium disputes have their own mandatory-mediation rules.

The correct pre-litigation route should therefore be determined after classifying the actual claim.

For further information, see our Mediation Lawyer in Alanya guide.


Arbitration Clauses

Large commercial construction contracts may contain arbitration clauses.

Before filing proceedings in court, the dispute-resolution clause should be reviewed.

Issues may include:

  • Turkish court jurisdiction

  • Domestic arbitration

  • International arbitration

  • Institutional rules

  • Seat of arbitration

  • Governing law

Filing in the wrong forum can create significant procedural cost and delay.


Which Court Handles a Construction Case?

There is no single court that hears every construction dispute.

The competent judicial branch can depend on:

  • Parties

  • Consumer status

  • Commercial status

  • Nature of the contract

  • Nature of the claim

  • Property rights involved

A dispute may potentially fall within the jurisdiction of:

  • Civil court

  • Consumer court

  • Commercial court

depending on its legal character.

The court should therefore be identified before proceedings are started.


Limitation Periods

Construction claims may be subject to different limitation periods depending on the legal basis and nature of the claim.

The relevant period may differ for:

  • Defective construction

  • Contractual debt

  • Consumer claims

  • Compensation

  • Other causes of action

For this reason, an owner should not rely on a general internet statement that all construction claims have the same deadline.

The contract, date of delivery, date the defect emerged and legal nature of the claim should all be considered.


Foreign Buyers in Construction Disputes

Foreign nationals who purchase new-build property in Alanya commonly face issues involving:

  • Delayed projects

  • Developer communication

  • Title transfer

  • Construction quality

  • Payment schedules

  • Additional payment requests

  • Missing Iskan

  • Different project specifications

Foreign nationality does not by itself determine the available remedy.

The same contract should be analysed according to Turkish law where Turkish law governs the transaction.


Can a Foreign Client Handle the Case From Abroad?

Many construction disputes can be handled through authorised representation.

A foreign client can often begin by electronically providing:

  • Passport

  • Contract

  • Bank transfers

  • Property documents

  • Correspondence

  • Photographs

  • Videos

Where formal representation is required, an appropriate power of attorney may be prepared.

For further information, see our Power of Attorney in Alanya guide.


Documents to Send to a Construction Lawyer

For a proper preliminary assessment, provide the complete file.

Contract Documents

  • Signed contract

  • All annexes

  • Technical specifications

  • Amendments

  • Additional-work agreements

Property Documents

  • TAPU

  • Block and parcel information

  • Independent-section details

  • Project information

Construction Documents

  • Building permit

  • Approved plans where available

  • Iskan information

  • Delivery protocol

Financial Documents

  • Bank transfers

  • SWIFT documents

  • Invoices

  • Receipts

  • Payment schedule

Communications

  • Email

  • WhatsApp

  • Letters

  • Formal notices

Technical Evidence

  • Photographs

  • Videos

  • Expert reports

  • Repair quotations

  • Measurements

A chronological summary is also very useful.


Prepare a Construction Timeline

For a delayed or disputed project, prepare a table identifying:

  1. Contract date

  2. Total purchase or construction price

  3. Each payment

  4. Promised completion date

  5. Promised title transfer date

  6. Actual construction progress

  7. Notices sent

  8. Developer responses

  9. Current position

This can make the legal assessment substantially clearer.


Common Mistakes in Construction Disputes

Property buyers and employers should be cautious about:

  • Waiting indefinitely on verbal promises

  • Stopping payments without reviewing the contract

  • Signing unconditional delivery documents despite defects

  • Repairing defects before documenting them

  • Accepting a replacement apartment without checking title

  • Signing a new agreement that waives existing rights

  • Assuming every delay automatically permits cancellation

  • Assuming every defect justifies termination

  • Treating TAPU and Iskan as the same thing

  • Ignoring the underlying landowner-contractor relationship

  • Failing to check mortgages and attachments

  • Relying only on estate-agent explanations

  • Waiting until evidence has disappeared


What to Do if Your Alanya Construction Project Is Delayed

A practical first-response process may include:

1. Review the Contract

Identify the promised delivery and title-transfer dates.

2. Check Your Payments

Determine whether the buyer has performed their own obligations.

3. Document Construction Progress

Take dated photographs and videos.

4. Obtain Current Property Information

Check the present title and restriction status.

5. Preserve Developer Communications

Keep all written promises concerning delivery.

6. Identify the Legal Objective

Decide whether you primarily want:

  • Completion

  • Property

  • Refund

  • Compensation

7. Assess the Need for Formal Notice

The notice should match the intended remedy.

8. Consider Evidence Preservation

Technical determination may be required.

9. Consider Interim Protection

If property or assets may be transferred, urgent measures may need to be evaluated.


Frequently Asked Questions

My developer is late. Can I cancel the contract?

Not every delay automatically gives the same termination right. The contractual delivery date, seriousness of the delay, legal regime and notices should be examined.

Should I stop paying instalments?

Not before reviewing the agreement and legal consequences. An unjustified suspension may create a counter-allegation of breach.

The apartment has defects. What should I do?

Document the defects, preserve technical evidence and consider giving appropriate notice promptly.

Can I ask the developer to repair defects?

Depending on the legal relationship and nature of the defect, repair may be among the available remedies.

Can I demand a price reduction?

A price reduction can potentially be relevant in defective-performance disputes where the applicable legal conditions are met.

Can I cancel because of defects?

Only in appropriate circumstances. The seriousness of the defect and applicable legal provisions matter.

Should I sign the delivery protocol?

Read it carefully. If there are defects or missing work, signing an unconditional statement that everything is complete may create evidentiary difficulties.

What if the developer does not transfer my TAPU?

The contract, current title records, ownership and payments should be examined promptly.

What if there is a mortgage on the project?

The mortgage creditor, amount and proposed method of discharge should be identified.

What if the developer and landowner are fighting?

The underlying construction agreement and the buyer's legal position may both need to be reviewed.

Can I request an expert inspection before filing a lawsuit?

Depending on the circumstances, determination of evidence may be available to preserve technical findings.

Do I have to go to mediation?

It depends on the legal classification of the particular dispute.

Can I handle my case while living outside Turkey?

Many stages may be handled through authorised legal representation.

Does every off-plan buyer have the same consumer rights?

No. Consumer status and applicability of special prepaid-housing rules depend on the parties and purpose of the transaction.


Construction Due Diligence Before Buying Off-Plan Property

Legal assistance is often more useful before the dispute develops.

Before purchasing an unfinished property, consider reviewing:

Developer

  • Company identity

  • Authority

  • Contracting entity

Land

  • Registered owner

  • Mortgages

  • Attachments

  • Restrictions

Project

  • Building permit

  • Approved plans

  • Developer's authority

  • Construction status

Contract

  • Exact apartment

  • Price

  • Payment schedule

  • Completion date

  • Delivery date

  • TAPU transfer

  • Penalties

  • Cancellation

  • Refund

Security

Where applicable:

  • Project security

  • Guarantee

  • Payment protections

Exit

Ask:

  • What happens if construction stops?

  • What happens if title cannot be transferred?

  • What happens if the project changes?

  • How is the money recovered?

These questions are considerably easier to address before substantial funds are transferred.


Related Legal Guides

Clients dealing with construction and property matters may also review:


Contact an Alanya Construction Lawyer

If you are involved in a delayed construction project, defective building, title deed dispute or disagreement with a developer or contractor in Alanya, the appropriate legal strategy should be determined from the complete contract and project documents.

For an initial assessment, it is useful to provide:

  • Complete contract

  • All annexes

  • Payment records

  • TAPU information

  • Promised delivery date

  • Current construction photographs

  • Communications with the developer or contractor

  • Technical reports where available

Attorney Enes Nergiz
Antalya Bar Association – Registration No. 6281

Telephone: +90 553 417 23 13
Email: [email protected]
Address: Hacet Mahallesi, Adliye Caddesi, Göret Apartmanı, Kat 3, No. 5, Alanya / Antalya, Turkey

For broader property-related legal information, visit our Alanya Real Estate Lawyer page.

This page provides general information concerning construction contracts and property disputes under Turkish law. It does not determine the legal rights of any particular buyer, landowner, developer or contractor and does not constitute individual legal advice. Construction disputes should be assessed according to the contract, title records, technical evidence and circumstances of the particular project.

Hakkımızda
Hukuk, bireylerin ve kurumların hayatında giderek daha fazla önem taşıyan bir alandır. Hukuki süreçlerin açık, anlaşılır ve doğru şekilde ele alınması, sağlıklı bir değerlendirme yapılabilmesi bakımından önemlidir. Avukat Enes Nergiz, Antalya’da avukatlık faaliyeti yürütmektedir. Çalışmalarını hukuki uyuşmazlığın niteliğine, ilgili mevzuata ve somut olayın özelliklerine göre sürdürmektedir. İngilizce ve Rusça dillerinde iletişim kurulabilmektedir.